Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1746372.015
Citation: 02003A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/29/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/02/2024
Gravity:
Report ID: 0523300
Contest Date:
Final Order: 09/24/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/24/2024 | $0.00 | 12/02/2024 | Other | |
Penalty | Z: Issued | 08/29/2024 | $0.00 | 09/20/2024 | Other |
Text For Citation: 02 Item/Group: 003A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about May 6, 2024, the energy control procedures for the Bruel Hoop Washer were not specifically outlined for shutting down and isolating the machine to control the pneumatic and hydraulic energy.