Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 102725371
Citation: 02003A
Citation Type: Willful
Abatement Status: X
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 12/05/1990
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 12/11/1990
Gravity: 07
Report ID: 0317000
Contest Date:
Final Order:
Related Event Code (REC): R
Emphasis:
Translate