Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 955621.015
Citation: 02003
Citation Type: Other
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/10/2014
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/20/2014
Gravity:
Report ID: 0419400
Contest Date: 04/02/2014
Final Order: 07/13/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 07/13/2015 | $0.00 | 03/20/2014 | Other | |
| Penalty | C: Contested | 04/02/2014 | $0.00 | 03/20/2014 | Other | |
| Penalty | Z: Issued | 03/10/2014 | $0.00 | 03/20/2014 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws: (a) 2535 Sanderson Drive in Laurel, MS - On or about January 15, 2014, in the evisceration department, employees working during the sanitation shift were exposed to electrical shock hazards due to a flexible cord hanging from the ceiling that had a defective strain relief in the damp location.
Translate