Standard Cited: 19100303 F02 General.
Inspection Nr: 930839.015
Citation: 02003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/22/2013
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 12/09/2013
Gravity:
Report ID: 0626600
Contest Date:
Final Order: 11/18/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/18/2013 | $0.00 | 12/09/2013 | Other | |
| Penalty | Z: Issued | 10/22/2013 | $0.00 | 11/08/2013 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: The employer does not ensure that all service, feeder, and branch circuits are legibly marked indicating its purpose or located so that the purpose is evident. This violation occurred on or about August 14, 2013, in the mill area where multiple breaker boxes containing several feeders and branch circuits were being used to provide power throughout the facility without having their disconnecting means or overcurrent device labeled for its purpose or arranged so that the purpose was evident. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all service, feeder, and branch circuits are legibly marked to indicate its purpose or arranged so that the purpose is evident.