Violation Detail
Standard Cited: 19100180 D04 Crawler locomotive and truck cranes.
Inspection Nr: 614238.015
Citation: 02003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/05/2012
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/15/2012
Gravity:
Report ID: 0626600
Contest Date:
Final Order: 11/01/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/05/2012 | $0.00 | 10/15/2012 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.180(d)(4): Complete inspection(s) of crane(s) were not performed at intervals as generally defined in 1910.180(d)(ii) with a determination made as to whether deficiencies constituted a safety hazard: The employer does not ensure that cranes used by employees are subjected to periodic inspections as defined by the standard. This violation occurred on or about September 04, 2012, and at times prior thereto, when employees operated a crane that had not been inspected at a periodic frequency. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that cranes used by employees are subjected to inspections by qualified personnel at frequencies required by 29 CFR 1910.180(d).