Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 480339.015
Citation: 02003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/18/2012
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 10/19/2012
Gravity:
Report ID: 0729700
Contest Date:
Final Order: 11/14/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/14/2012 | $0.00 | 10/19/2012 | Other | |
| Penalty | Z: Issued | 10/18/2012 | $0.00 | 10/19/2012 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Unless Specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords may not be used; Where run through holes in walls, ceilings, or floors. In the ABS Maintenance Shop, flex cords were extending through walls located: a) On the main brick wall energizing a clock. b) Through a metal cabinet energizing a small battery charger.
Translate