Violation Detail
Standard Cited: 19100304 E01 II Wiring design and protection.
Inspection Nr: 1705926.015
Citation: 02003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/26/2024
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 04/19/2024
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 04/26/2024
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/26/2024 | $0.00 | 04/19/2024 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.304(e)(1)(ii): The service disconnecting means did not plainly indicate whether it is in the open or closed position: a) Radford Army Ammunition Plant Piccolo area: On or about 10/25/2023, the 440-volts Master switch used to supply power to the pumps motor room, the open or closed positions eroded. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.