Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1670004.015
Citation: 02003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/03/2023
Nr Instances: 2
Nr Exposed: 10
Abatement Date: 11/01/2023
Gravity:
Report ID: 0418200
Contest Date:
Final Order: 11/20/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/20/2023 | $0.00 | 11/01/2023 | Other | |
| Penalty | Z: Issued | 10/03/2023 | $0.00 | 11/01/2023 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a) Slear #1: On or about , May 11, 2023, and at times prior, the employer exposed employees to electric shock hazards, in that a cover was not installed on the 4-inch by 4-inch metal electrical junction box located on the stacker table to prevent inadvertent contact by employees working in the area. b) Slear #2: On or about , May 11, 2023, and at times prior, the employer exposed employees to electric shock hazards, in that the cover of the metal, electrical junction box on the #2 Slear was inadequately secured and hanging from the box by one attachment point leaving electrical wiring exposed.
Translate