Violation Detail
Standard Cited: 19100269 P04 III A Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1363002.015
Citation: 02003
Citation Type: Serious
Abatement Date: 04/18/2022 2
Initial Penalty: $132,598.00
Current Penalty: $132,598.00
Issuance Date: 05/22/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0626300
Contest Date: 05/23/2019
Final Order: 04/18/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/18/2022 | $132,598.00 | 04/18/2022 | Serious | |
Penalty | C: Contested | 06/04/2019 | $132,598.00 | 05/29/2019 | Willful | |
Penalty | Z: Issued | 05/22/2019 | $132,598.00 | 05/29/2019 | Willful |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.269(p)(4)(iii)(A): The employer did not ensure that energized lines or equipment exposed to contact are covered with insulating protective material that will withstand the type of contact that could be made during the operation. On or about November 27, 2018, at a worksite located on St. Augustine Street, Dallas, Texas, employees working on replacing a pole near exposed energized electrical power lines were exposed to electrical shock and burn hazards.