Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1245028.015
Citation: 02003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $406.00
Current Penalty: $224.00
Issuance Date: 12/11/2017
Nr Instances: 2
Nr Exposed: 9
Abatement Date: 02/28/2018
Gravity:
Report ID: 0524200
Contest Date:
Final Order: 01/05/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2018 | $224.00 | 02/28/2018 | Other | |
Penalty | Z: Issued | 12/11/2017 | $406.00 | 01/08/2018 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces: a) Line 3- On or about August 18, 2017, the employer failed ensure that flexible cords were not attached to building surfaces as the flexible cord for the Color Exact Motor had its flexible cord zip tied to the structure. b) Line 7- On or about July 6, 2017, the employer failed ensure that flexible cords were not attached to building surfaces as numerous flexible and extension cords were zip tied to and/or wound around various structures. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.