Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 116273269
Citation: 02003
Citation Type: Other
Abatement Status: X
Initial Penalty: $600.00
Current Penalty: $400.00
Issuance Date: 05/18/1995
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 05/23/1995
Gravity: 03
Report ID: 0316400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/31/1995 | $400.00 | 05/23/1995 | Other | |
| Penalty | Z: Issued | 05/18/1995 | $600.00 | 05/23/1995 | Other |
Translate