Powered by GoogleTranslate

Violation Detail

Standard Cited: 19101000 E Air contaminants.

Inspection Nr: 963676.015

Citation: 02002B

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 05/29/2014

Nr Instances: 1

Nr Exposed: 1

Abatement Date: 11/08/2014

Gravity: 5

Report ID: 0524700

Contest Date:

Final Order: 06/17/2014

Related Event Code (REC):

Emphasis:

Substance: 9010


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 06/17/2014 $0.00 11/08/2014 Serious  
Penalty Z: Issued 05/29/2014 $0.00 10/08/2014 Serious  

Text For Citation: 02 Item/Group: 002B Hazard:

29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d): a) B.W. Grinding Co. dba B.W. Supply located in Lyons, Ohio: On or about April 8, 2014 an employee working in the Grinding department was over exposed to crystalline silica dust at an eight hour time weighted hour of 2.246 mg/m3 which was 186% of the calculated permissible exposure limit of 1.206 mg/m3. Step 1: Within 30 days effective respiratory protection shall be provided and used by exposed employees as an interim protective measure until feasible engineering and / or administrative controls can be implemented, or whenever such controls fail to reduce employee exposure to within permissible exposure limits. When personal exposure concentrations exceed the maximum allowable concentration for the respirator used, the employer shall ensure employees are protected with a respirator appropriate for the exposure concentration. Step 2: Within 60 days submit to the Area Director a written, detailed plan of abatement outlining a schedule for the implementation of engineering and /or administrative measures to control employee exposure to hazardous substances as referenced in the citation. This plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this citation. 1. Evaluation of engineering / administrative controls options; 2. Selection of optimum control methods and completion of design; 3. Procurement, installation, and operation of selected control measures; and, 4. Testing and acceptance or modification/redesign of controls. Step 3: Within 90 days abatement shall have been completed by the implementation of feasible engineering and / or administrative controls upon verification of their effectiveness in achieving compliance. Feasible engineering controls include but are not limited to: 1. Installing mechanical ventilation over the grinding tables to ensure local ventilation is increased thereby reducing employee exposure below the OSHA PEL for crystalline silica Date by which step 1 must be abated: Date by which step 2 must be abated: extended per ISA 09/26/2014 Date by which step 3 must be abated: extended per ISA 11/08/2014 Ultimate responsibility for determining the most appropriate method rests with the employer, given his superior knowledge of the specific conditions at the workplace.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close