Violation Detail
Standard Cited: 19100119 D02 I C Process safety management of highly hazardous chemicals.
Inspection Nr: 1755022.015
Citation: 02002B
Citation Type: Other
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/29/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/20/2024
Gravity:
Report ID: 0214200
Contest Date: 12/19/2024
Final Order:
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 02/11/2025 | $0.00 | 12/20/2024 | Other | |
Penalty | Z: Issued | 11/29/2024 | $0.00 | 12/20/2024 | Other |
Text For Citation: 02 Item/Group: 002B Hazard:
29 CFR 1910.119(d)(2)(i)(C): Process safety information pertaining to the technology of the process did not include the maximum intended quantity: a) Sparta Facility: at or near 188 Houses Corner Road; Sparta, NJ: The maximum intended inventory of propane was not included into the process safety information, on or about 06/13/24.