Violation Detail
Standard Cited: 19100146 C01 Permit-required confined spaces
Inspection Nr: 1705926.015
Citation: 02002A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/26/2024
Nr Instances: 1
Nr Exposed: 17
Abatement Date: 04/19/2024
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 04/26/2024
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/26/2024 | $0.00 | 04/19/2024 | Other |
Text For Citation: 02 Item/Group: 002A Hazard:
29 CFR 1910.146(c)(1): The employer did not evaluate the workplace to determine if any spaces were permit-required confined spaces: a) Radford Army Ammunition Plant: On or about 10/25/2023, the employer did not evaluate the Oleum Utility Vault to determine if the space was a permit-required confined space. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate