Violation Detail
Standard Cited: 19101200 E01 Hazard Communication.
Inspection Nr: 1633930.015
Citation: 02002A
Citation Type: Other
Abatement Date: 05/25/2023 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/05/2023
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0213100
Contest Date:
Final Order: 06/01/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/01/2023 | $0.00 | 05/25/2023 | Other | |
Penalty | Z: Issued | 05/05/2023 | $0.00 | 05/25/2023 | Other |
Text For Citation: 02 Item/Group: 002A Hazard:
29 CFR 1910.1200(e)(1):Employer had not developed or implemented a written hazard communication program included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): (Construction Reference: 1926.59) (a) At the jobsite, during painting: On or about 11/10/22, the employer did not implement a written hazard communication program where employees were working with paints and related products, including, but not limited to: Benjamin Moore Super Hide latex paint and DAP 33 Window Glazing, which contain hazardous chemicals that can cause respiratory, eye, and skin irritation.