Violation Detail
Standard Cited: 19100134 F02 Respiratory Protection.
Inspection Nr: 1530829.015
Citation: 02002A
Citation Type: Repeat
Abatement Status: Abatement Completed
Initial Penalty: $27,033.00
Current Penalty: $17,571.45
Issuance Date: 11/02/2021
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 04/04/2022
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 12/14/2021
Related Event Code (REC):
Emphasis:
Substance: 9130
Substance: P104
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/14/2021 | $17,571.45 | 04/04/2022 | Repeat | |
Penalty | Z: Issued | 11/02/2021 | $27,033.00 | 11/17/2021 | Repeat |
Text For Citation: 02 Item/Group: 002A Hazard:
29 CFR 1910.134(f)(2):Employee(s) using tight-fitting facepiece respirators were not fit tested prior to initial use of the respirator: a) On or about May 13, 2021, in the production area, employees required to use 3M 6000 respirators during cement production tasks were not fit tested, exposing them to inhalation hazards. Sesco Cement, Corp was previously cited for a violation of this occupational safety and health standard 1910.134(f)(2), which was contained in OSHA inspection number 1318392, citation number 1, item number 1c and was affirmed as a final order on 12/13/2018, with respect to a workplace located at 8510 E, Sam Houston Pkwy N, Houston TX, 77044.