Violation Detail
Standard Cited: 19100134 D03 III B 2 Respiratory Protection.
Inspection Nr: 912002.015
Citation: 02002
Citation Type: Other
Abatement Date: 08/15/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/11/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity:
Report ID: 0830500
Contest Date:
Final Order: 08/06/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 07/11/2013 | $0.00 | 08/15/2013 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.134(d)(3)(iii)(B)(2): The employer did not implement a change schedule for canisters and cartridges that is based on objective information or data that will ensure that canisters and cartridges are changed before the end of their service life: (a) Gold Plane Custom Cabinets, LLC, 11170 Irma Drive, Northglenn, CO 80233: On and before June 13, 2013, the employer did not develop and implement a change schedule for cartridges so that the cartridges are removed from service prior to the end of their service life. Employees are required to wear 3M tight-fitting, half mask respirators equipped with organic vapor cartridges while spray painting. This condition potentially exposes employees to organic vapors if a chemical vapor break through of the cartridge were to occur.