Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 910682.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/05/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/02/2014
Gravity:
Report ID: 0336000
Contest Date:
Final Order: 12/18/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/18/2013 | $0.00 | 01/02/2014 | Other | |
| Penalty | Z: Issued | 12/05/2013 | $0.00 | 01/02/2014 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: a) American Tinning & Galvanizing Company / 552 West 12th Street, Erie, PA: On or about June 7, 2013 the company did not document or certify periodic annual inspections of the energy control procedures were completed.
Translate