Violation Detail
Standard Cited: 19261101 K02 I Asbestos
Inspection Nr: 906920.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/17/2013
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 11/20/2013
Gravity:
Report ID: 0317000
Contest Date:
Final Order: 11/12/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/12/2013 | $0.00 | 11/20/2013 | Other | |
| Penalty | Z: Issued | 10/17/2013 | $0.00 | 11/20/2013 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.1101(k)(2)(i): Before work subject to this standard began, the building and/or facility owner(s) did not determine the presence, location and quantity of asbestos containing material (ACM) and/or presumed asbestos containing material (PACM) at the worksite pursuant to 29 CFR 1926.1101(k)(1): a) Associates Warehousing Inc., 2845 East Westmoreland Street, Philadelphia, Pa- The facility owner had employees perform work on the existing cementitious roof of Building 1 and had not performed a determination of the presence, location and quantity of ACM or PACM. b) Associates Warehousing Inc., 2845 East Westmoreland Street, Philadelphia, Pa- The owner hired a roofing contractor to complete work on the existing cementitious roof of Building 1 and had not performed a determination of the presence, location and quantity of ACM or PACM. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.