Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 316735489
Citation: 02002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,800.00
Current Penalty: $1,800.00
Issuance Date: 09/23/2013
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 03/23/2013
Gravity:
Report ID: 1055360
Contest Date: 10/18/2013
Final Order: 02/06/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 02/06/2015 | $1,800.00 | 03/23/2013 | Serious | |
| Penalty | Z: Issued | 09/23/2013 | $1,800.00 | 03/23/2013 | Serious |
Translate