Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 315860635
Citation: 02002
Citation Type: Other
Abatement Status: X
Initial Penalty:
Current Penalty:
Issuance Date: 11/08/2011
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/02/2011
Gravity: 01
Report ID: 0213900
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/05/2011 | 12/02/2011 | Other | ||
| Penalty | Z: Issued | 11/08/2011 | 12/02/2011 | Other |
Text For Citation: 02 Item/Group: 002 Hazard: REFINERY
29 CFR 1910.147 (c)(6) The employer did not certify that the periodic inspections were performed. The certification did not identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection. a) Throughout facility: The employer did not certify that periodic inspections were completed for the energy control procedures, on or about 10/3/11. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.