Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 315675595
Citation: 02002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $100.00
Current Penalty: $100.00
Issuance Date: 01/31/2012
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/11/2012
Gravity:
Report ID: 1055340
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate