Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1800699.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/22/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/16/2025
Gravity:
Report ID: 0522300
Contest Date:
Final Order: 05/08/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 05/16/2025 | $0.00 | 07/16/2025 | Other | |
Penalty | I: Informal Settlement | 05/08/2025 | $0.00 | 07/16/2025 | Other | |
Penalty | Z: Issued | 04/22/2025 | $0.00 | 05/16/2025 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained: On or about January 29, 2025, the employer failed to ensure that there was a visible gauge, audible alarm, or pressure activated devices installed on the paint spray booth to indicate or ensure that the require air speed was maintained while parts were sprayed with various solvent based paints and primers.