Violation Detail
Standard Cited: 19100272 G01 II Grain handling facilities.
Inspection Nr: 1746265.015
Citation: 02002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,067.00
Current Penalty: $8,067.00
Issuance Date: 10/24/2024
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 11/20/2024
Gravity: 5
Report ID: 0627100
Contest Date:
Final Order: 11/26/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 12/19/2024 | $8,067.00 | 11/20/2024 | Serious | |
Penalty | Z: Issued | 10/24/2024 | $8,067.00 | 11/20/2024 | Serious |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.272(g)(1)(ii): Prior to entry, all mechanical, electrical, hydraulic, and pneumatic equipment which presented a danger to employees inside grain storage structures in the grain handling facility were not disconnected, locked out and tagged, blocked-off, or otherwise prevented from operating by other equally effective means or methods: a) On or about May 5, 2024, in Bin 3, employees were performing rice grain milling activities where the equipment and machinery such as but not limited to the sweep and pull-out augers were not de-energized prior to entering the storage bin. b) On or about May 6, 2024, in Bin 4, employees were performing rice grain milling activities where the equipment and machinery such as but not limited to the sweep and pull-out augers were not de-energized prior to entering the storage bin.