Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1435663.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/25/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/22/2020
Gravity:
Report ID: 0418300
Contest Date:
Final Order: 04/21/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/21/2020 | $0.00 | 05/22/2020 | Other | |
| Penalty | Z: Issued | 03/25/2020 | $0.00 | 04/20/2020 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures: (a) On or about October 03, 2019 - Bagging area, employees were exposed to struck-by hazards when the electrical verification step said to attempt to start the equipment by activating the equipment operator controls (On & Off) button/switch. The Pacmac does not have an On/Off button or switch. Pneumatic said to bleed residual air.