Violation Detail
Standard Cited: 19100266 D08 II Logging operations.
Inspection Nr: 1411327.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $319.00
Current Penalty: $159.00
Issuance Date: 10/09/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/18/2019
Gravity:
Report ID: 0111100
Contest Date:
Final Order: 10/29/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/29/2019 | $159.00 | 10/18/2019 | Other | |
| Penalty | Z: Issued | 10/09/2019 | $319.00 | 10/18/2019 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.266(d)(8)(ii): The employer shall notify the power company immediately if a felled tree makes contact with any power line. Each employee shall remain clear of the area until the power company advises that there are no electrical hazards: Worksite - The Employer did not contact the power company immediately after contacting the 345,000 volt overhead lines with felled trees at the landing site.
Translate