Violation Detail
Standard Cited: 19260501 B10 Duty to have fall protection.
Inspection Nr: 1403353.015
Citation: 02002
Citation Type: Repeat
Abatement Status: Abatement Completed
Initial Penalty: $29,172.00
Current Penalty: $16,045.00
Issuance Date: 09/17/2019
Nr Instances: 10
Nr Exposed: 10
Abatement Date: 09/23/2019
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 10/03/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/03/2019 | $16,045.00 | 09/23/2019 | Repeat | |
Penalty | Z: Issued | 09/17/2019 | $29,172.00 | 09/23/2019 | Repeat |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system; a) On or about May 23, 2019, employees were exposed to the hazard of falling approximately 15 feet while performing roofing work without the use of fall protection or a safety monitor. Dynamic Exteriors 10, Inc., was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501 (b)(10) which was contained in OSHA inspection number 979947, citation 1, item 1, and was affirmed as a final order on October 21, 2014, with respect to a worksite located at 923 West Randolph, Chicago, Illinois. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.