Violation Detail
Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1390513.015
Citation: 02002
Citation Type: Other
Abatement Date: 06/12/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/08/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity:
Report ID: 0522500
Contest Date:
Final Order: 05/29/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/29/2019 | $0.00 | 06/12/2019 | Other | |
Penalty | Z: Issued | 05/08/2019 | $0.00 | 06/12/2019 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(7)(i)(B): Each affected employee shall be instructed in the purpose and use of the energy control procedure. a. On or before March 26, 2019, the employer did not ensure that each employee, who was involved in the operations of the 1675 Wean United Youngstown Foundry & Machine aluminum extrusion press (press 2; model: 7"-1675 ton press; S/N: 38876) in the extrusion department where energy control procedures were utilized, was instructed about the procedure and about the prohibition relating to attempts to restart or reenergize machines or equipment which were locked/tagged out.