Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1374091.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/10/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/06/2019
Gravity:
Report ID: 0626300
Contest Date:
Final Order: 05/31/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/31/2019 | $0.00 | 06/06/2019 | Other | |
Penalty | Z: Issued | 05/10/2019 | $0.00 | 06/06/2019 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.184(e)(3)(i): Thorough periodic inspections of alloy steel chain slings in use were not made on a regular basis: (a) On or about April 10, 2019 an alloy steel chain sling attached to overhead crane CR 12 had not been periodically inspected in that no documentation of any inspections could be provided when requested. This exposed employees using the sling twice a night, lifting loads up to 18,249 pounds, to a crushed-by hazard.