Violation Detail
Standard Cited: 19100269 J02 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1306095.015
Citation: 02002
Citation Type: Other
Abatement Date: 11/01/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/02/2018
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): R
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 10/24/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2018 | $0.00 | 11/01/2018 | Other | |
Penalty | Z: Issued | 10/02/2018 | $0.00 | 11/01/2018 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.269(j)(2)(iii): Live-line tools used for primary employee protection shall be removed from service every 2 years, and whenever required under paragraph (j)(2)(ii) of this section, for examination, cleaning, repair, and testing as follows: (a) Jobsite - On or about April 04, 2018 employer does not test live line tools.