Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1303753.015
Citation: 02002
Citation Type: Other
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/06/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0728900
Contest Date:
Final Order: 07/31/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 07/06/2018 | $0.00 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: The employer is failing to document the energy control procedure required for maintenance on the 20 cubic yard Coneco concrete batch mixer. This was most recently documented to occur on or about March 19, 2018 and dates prior in the workplace located at 431 A Street, Lincoln, NE 68501. A machine specific lockout/tagout procedure was not developed for the this equipment that explains hazardous energy sources, the proper sequence for de-energization, and specific energy isolation points for multiple energy sources such as the multiple electrical motors and conveyor feeds.