Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1255052.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/02/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/22/2018
Gravity:
Report ID: 0627510
Contest Date:
Final Order: 01/25/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/25/2018 | $0.00 | 01/22/2018 | Other | |
| Penalty | Z: Issued | 01/02/2018 | $0.00 | 01/22/2018 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: The electrical power panel in the accident work area next to the Piranha power press was not properly marked.