Violation Detail
Standard Cited: 19260602 D Material handling equipment.
Inspection Nr: 1234809.015
Citation: 02002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/30/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/19/2017
Gravity:
Report ID: 0213100
Contest Date:
Final Order: 06/06/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/06/2017 | $0.00 | 06/19/2017 | Other | |
| Penalty | Z: Issued | 05/30/2017 | $0.00 | 06/19/2017 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.602(d): The employer did not certify that each operator had been trained and evaluated as required by paragraph 29 CFR 1910.178(l): Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178. (a) At the jobsite, during roofing work: On or prior to 5/24/17, the operator of an Ingersoll Rand telehandler had not been recertified within 3 years.
Translate