Violation Detail
Standard Cited: 19100146 E01 Permit-required confined spaces
Inspection Nr: 1226618.015
Citation: 02002
Citation Type: Willful
Abatement Date: 11/06/2017 2
Initial Penalty: $114,074.00
Current Penalty: $74,149.00
Issuance Date: 10/11/2017
Nr Instances: 4
Nr Exposed: 11
Related Event Code (REC): A
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 10/24/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2017 | $74,149.00 | 11/06/2017 | Willful | |
Penalty | Z: Issued | 10/11/2017 | $114,074.00 | 11/06/2017 | Willful |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.146(e)(1): Before entry was authorized, the employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit: (a) On or about April 16, 2017, and times prior thereto at Plant #3- Tunnel Kiln; employees were required to enter a permit required confined space exposing employees to hazardous conditions within the space. (b) On or about April 14, 2017, and times prior thereto at Plant #3- Tunnel and Roller Kiln Dryers; employees were required to enter a permit required confined space exposing employees to hazardous conditions within the space. (c) On or about April 14, 2017, and times prior thereto at Plant #3-Clay Silos and Bins; employees were required to enter a permit required confined space exposing employees to hazardous conditions within the space. (d) On or about April 14, 2017, and times prior thereto at Plant #3- Tunnel and Roller Auger Press Pits; employees were required to enter a permit required confined exposing employees to hazardous conditions within the space.