Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1216581.015
Citation: 02002
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/28/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity:
Report ID: 0418200
Contest Date: 09/26/2017
Final Order: 05/04/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 05/04/2018 | $0.00 | Other | ||
Penalty | C: Contested | 10/10/2017 | $0.00 | Other | ||
Penalty | Z: Issued | 08/28/2017 | $0.00 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: (a) Live receiving: On or about 03/08/2017, and at times prior, the employer exposed employees to potential electrical shock hazards, in that a cover was not placed over the electrical outlet being used to power and industrial fan. (b) Outside chemical room: On or about 03/08/2017, and at times prior, the employer exposed employees to potential electrical shock hazards, in that the electrical outlet outside the chemical storage room was not completely covering the internal energized circuits.