Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 1164163.015
Citation: 02002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,000.00
Current Penalty: $2,800.00
Issuance Date: 11/03/2016
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 12/08/2016
Gravity: 7
Report ID: 0454713
Contest Date:
Final Order: 11/21/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/21/2016 | $2,800.00 | 12/08/2016 | Serious | |
Penalty | Z: Issued | 11/03/2016 | $4,000.00 | 12/08/2016 | Serious |