Violation Detail
Standard Cited: 19100119 E03 V Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 1159234.015
Citation: 02002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,471.00
Current Penalty: $0.00
Issuance Date: 09/09/2016
Nr Instances: 1
Nr Exposed: 17
Abatement Date: 10/27/2016
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 09/28/2016
Related Event Code (REC): C
Emphasis:
Substance: 0120
Substance: 0410
Substance: 2280
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/28/2016 | $0.00 | 10/27/2016 | Serious | |
| Penalty | Z: Issued | 09/09/2016 | $12,471.00 | 10/27/2016 | Serious |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address the hazards related to facility siting: (a) The most recent PHA did not address the location of the Emulsion CWD Control Room in Building 38 and the ability of the control room to protect employees from chemical exposures, fires and explosions in the Emulsion CWD area. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Translate