Violation Detail
Standard Cited: 19260501 B13 Duty to have fall protection.
Inspection Nr: 1105868.015
Citation: 02002
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $28,000.00
Current Penalty: $15,400.00
Issuance Date: 02/04/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/24/2016
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 04/08/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/08/2016 | $15,400.00 | 02/24/2016 | Willful | |
Penalty | Z: Issued | 02/04/2016 | $28,000.00 | 02/24/2016 | Willful |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) 443 - 447 Marlene Way Leola, Pennsylvania - Employees were installing roofing shingles 17 feet 5 inches above the ground without the use of fall protection, on or about November 16, 2015. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.