Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1085892.015
Citation: 02002
Citation Type: Willful
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $24,200.00
Current Penalty: $24,200.00
Issuance Date: 01/13/2016
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 01/26/2016
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 02/26/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/13/2016 | $24,200.00 | 01/26/2016 | Willful |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form or scrap lumber with protruding nails was not kept clear from work areas: Location: building 6 interior and exterior On or about 8/17/15, The employer failed to protect employees from laceration and puncture hazards from scrap lumber with protruding nails laying on the ground and on scaffolds.