Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1018388.015
Citation: 02002
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $69,300.00
Current Penalty: $35,000.00
Issuance Date: 07/10/2015
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 10/30/2015
Gravity: 10
Report ID: 0627500
Contest Date:
Final Order: 09/28/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/28/2015 | $35,000.00 | 10/30/2015 | Willful | |
Penalty | Z: Issued | 07/10/2015 | $69,300.00 | 07/16/2015 | Willful |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): In the production area, employees were exposed to caught-between and struck-by hazards while operating the 500-ton Sutherland Hydraulic Press #2 (Model No. HD-500, Serial No. 28058). The point of operation was not guarded.