Violation Detail
Standard Cited: 19100333 B02 Selection and use of work practices
Inspection Nr: 1012477.015
Citation: 02001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,500.00
Current Penalty: $0.00
Issuance Date: 03/13/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/19/2015
Gravity: 5
Report ID: 0111700
Contest Date: 04/01/2015
Final Order: 06/17/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/01/2015 | $0.00 | 03/19/2015 | Serious | |
Penalty | C: Contested | 04/07/2015 | $3,500.00 | 03/19/2015 | Serious | |
Penalty | Z: Issued | 03/13/2015 | $3,500.00 | 03/19/2015 | Serious |
Text For Citation: 02 Item/Group: 001C Hazard:
29 CFR 1910.333(b)(2): While an employee was exposed to contact with parts of fixed electric equipment or circuits which were deenergized, the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements of this paragraph (b) of 29 CFR 1910.333(b)(2): a. Site - Employees replacing a light fixture were not protected from electrical shocks and burns when the circuit controlling the light was not locked out.