Violation Detail
Standard Cited: 19261101 L04 II Asbestos
Inspection Nr: 964616.015
Citation: 02001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/04/2014
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/10/2014
Gravity: 10
Report ID: 0521700
Contest Date: 10/20/2014
Final Order: 04/27/2015
Related Event Code (REC): R
Emphasis:
Substance: 9020
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/27/2015 | $0.00 | 09/10/2014 | Serious | |
| Penalty | C: Contested | 10/22/2014 | $0.00 | 09/10/2014 | Willful | |
| Penalty | Z: Issued | 09/04/2014 | $0.00 | 09/10/2014 | Willful |
Text For Citation: 02 Item/Group: 001B Hazard:
29 CFR 1926.1101(l)(4)(ii): Waste and debris and accompanying dust in an area containing accessible thermal system insulation or surfacing ACM/PACM or visibly deteriorated ACM shall be promptly cleaned up and disposed of in leak tight containers. a. On or about March 25, 2014, at the above addressed jobsite, employees and subcontractor employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities. The employer failed to collect, clean up, dispose of in sealed, labeled, impermeable bags the removed thermal system insulation, visibly damaged thermal insulation and other ACM and/or PACM debris.