Violation Detail
Standard Cited: 19261432 B02
Inspection Nr: 504978.015
Citation: 02001B
Citation Type: Serious
Abatement Date: 02/14/2013 2
Initial Penalty: $0.00
Current Penalty: $7,000.00
Issuance Date: 12/27/2012
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC): A
Gravity: 10
Report ID: 0521100
Contest Date: 01/18/2013
Final Order: 02/07/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/07/2014 | $7,000.00 | 02/14/2013 | Serious | |
Penalty | C: Contested | 04/08/2013 | $0.00 | 02/14/2013 | Willful | |
Penalty | Z: Issued | 12/27/2012 | $0.00 | 02/14/2013 | Willful |
Text For Citation: 02 Item/Group: 001B Hazard:
29 CFR 1926.1432(b)(2): The lift director did not review the multiple crane lift plan in a meeting with all workers who were involved with the operation. On or about July 5, 2012, a lift director did not review the multiple crane lift plan in a meeting with all employees who were involved in the placement of bridge girders over Lake Butte des Morts, Bridge B-70-266. Employees were thereby exposed to the hazards associated with crane and load failures.