Violation Detail
Standard Cited: 19100269 D02 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1244609.015
Citation: 02001B
Citation Type: Willful
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/27/2017
Nr Instances: 1
Nr Exposed: 9
Abatement Date: 01/31/2018
Gravity: 10
Report ID: 0420600
Contest Date: 12/27/2017
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/02/2018 | $0.00 | 01/31/2018 | Willful | |
Penalty | Z: Issued | 12/27/2017 | $0.00 | 01/31/2018 | Willful |
Text For Citation: 02 Item/Group: 001B Hazard:
29 CFR 1910.269(d)(2)(iii): Procedures were not developed, documented, and used for the control of potentially hazardous energy covered by paragraph (d) of this section: a) The employer did not develop, document, and implement specific LOTO procedures for shutting down the furnace and clearing clogs in the slag tanks, on or about June 29, 2017.