Violation Detail
Standard Cited: 19100272 G01 II Grain handling facilities.
Inspection Nr: 1097877.015
Citation: 02001B
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $49,000.00
Current Penalty: $0.00
Issuance Date: 03/11/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 03/25/2016
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 04/04/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/04/2016 | $0.00 | 03/25/2016 | Willful | |
Penalty | Z: Issued | 03/11/2016 | $49,000.00 | 03/25/2016 | Willful |
Text For Citation: 02 Item/Group: 001B Hazard:
29 CFR 1910.272(g)(1)(ii): All mechanical, electrical, hydraulic, and pneumatic equipment which presents a danger to employees inside grain storage structures was not de-energized, disconnected, locked-out and tagged, blocked-off, or otherwise prevented from operating by other equally effective means or methods: During the period between September 21, 2015 and February 8, 2016: Sweep augers and reclaim conveyors/augers were not de-energized and locked out prior to employee entry into grain bins.