Violation Detail
Standard Cited: 19261101 F03 I Asbestos
Inspection Nr: 1043352.015
Citation: 02001B
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/10/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/14/2015
Gravity: 10
Report ID: 0524530
Contest Date: 08/27/2015
Final Order: 01/07/2019
Related Event Code (REC): C
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/07/2019 | $0.00 | 08/14/2015 | Willful | |
Penalty | C: Contested | 09/01/2015 | $0.00 | 08/14/2015 | Willful | |
Penalty | Z: Issued | 08/10/2015 | $0.00 | 08/14/2015 | Willful |
Text For Citation: 02 Item/Group: 001B Hazard:
29 CFR 1926.1101(f)(3)(i): The employer fails to conduct daily monitoring that is representative of the exposure of each employee assigned to work in regulated areas and performing Class I or II work: The employer does not ensure that daily monitoring is performed to determine accurately the exposure to asbestos during Class I or Class II work. The lack of exposure monitoring most recently occurred on or about February 12, 2015 through March 3, 2015, when a negative exposure assessment was not completed in accordance with paragraph (f)(2)(iii) and the employer failed to conduct daily monitoring that was representative of the exposure of each employee assigned to work in the regulated areas while performing Class I or II asbestos work at the workplace during operations such as but not limited to: A.) Removal of asbestos-containing floor tile while not keeping the tile in an intact state. B.) Removal of asbestos-containing flooring mastic by aggressive methods such as sanding. C.) Removal of thermal system insulation without using engineering methods, work practice controls or personal protective equipment to control airborne concentrations of asbestos.