Violation Detail
Standard Cited: 19100022 A01 General requirements.
Inspection Nr: 980337.015
Citation: 02001A
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $28,000.00
Current Penalty: $19,730.00
Issuance Date: 11/28/2014
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/31/2015
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 01/30/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/30/2015 | $19,730.00 | 03/31/2015 | Willful | |
| Penalty | Z: Issued | 11/28/2014 | $28,000.00 | 12/24/2014 | Willful |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1910.22(a)(1): Place(s) of employment were not kept clean: On or about June 10, 2014 at 120 McArthur Road, Marble Hill, GA: a. Throughout the facility, heavy dust from sanding, grinding, and cutting on fiberglass/resin mixture, and saw dust from wood working accumulated on elevated vertical and horizontal flat surfaces, exposing employees to an explosion and fire hazard. b. In the shop area where fiberglass sheets are stored and cut, rags, scraps of tubing, fiberglass and other materials were not cleaned up in a timely manner. Excess materials have been allowed to accumulate in the area. c. Throughout the facility, empty containers that once contained chemicals including but not limited to Polycor, styrene, Norox MEKP-9H, and lacquer thinner were allowed to accumulate.
Translate