Violation Detail
Standard Cited: 19260651 C Specific Excavation Requirements.
Inspection Nr: 741983
Citation: 02001A
Citation Type: Willful
Abatement Status: X
Initial Penalty: $6,400.00
Current Penalty: $4,000.00
Issuance Date: 02/28/1989
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/03/1989
Gravity: 08
Report ID: 0317500
Contest Date: 03/14/1989
Final Order: 10/05/1989
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/05/1989 | $4,000.00 | 03/03/1989 | Willful | |
| Penalty | Z: Issued | 02/28/1989 | $6,400.00 | 03/03/1989 | Willful |
Translate