Violation Detail
Standard Cited: 19260652 B01 II Requirements for protective systems.
Inspection Nr: 1822286.015
Citation: 02001A
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $148,963.00
Current Penalty: $148,963.00
Issuance Date: 06/17/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/02/2025
Gravity: 10
Report ID: 0316700
Contest Date: 07/01/2025
Final Order:
Related Event Code (REC): I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/15/2025 | $148,963.00 | 07/02/2025 | Willful | |
Penalty | Z: Issued | 06/17/2025 | $148,963.00 | 07/02/2025 | Willful |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1926.652(b)(1)(ii): Slopes specified in paragraph b(1)(i) of this section, were not excavated to form configurations that are in accordance with the slopes shown for Type C soil in Appendix B to this subpart. a. Trench - On or about May 5, 2025, employees were exposed to caught in and struck by hazards while installing storm drain system at a depth of 9 feet inside a trench which had been sloped to a between 56 and 58 degrees. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.