Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1799395.015
Citation: 02001A
Citation Type: Willful
Abatement Status:
Initial Penalty: $165,514.00
Current Penalty: $165,514.00
Issuance Date: 07/11/2025
Nr Instances: 3
Nr Exposed: 7
Abatement Date: 08/07/2025
Gravity: 10
Report ID: 0214200
Contest Date: 08/07/2025
Final Order:
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 08/08/2025 | $165,514.00 | 08/07/2025 | Willful | |
| Penalty | Z: Issued | 07/11/2025 | $165,514.00 | 08/07/2025 | Willful |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i):Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) 1 Eastern Rd, Kearny NJ Maintenance employee did not utilize energy control procedures including, but not limited to, Power Dry and Dryer Mezzanine Conveyor when climbing into the drum of dryer #4 to remove a towel jammed in the unload door. Violation occurred on or about 1/18/2025 b) 1 Eastern Rd, Kearny NJ Maintenance employee did not utilize energy control procedure "Ironer line 5" to unjam Ironer #5. Violation occurred on or about 1/28/2025 c) 1 Eastern Rd, Kearny NJ A maintenance crew replaced a motor on Ironer #1 without locking out all the energy sources as indicated in the posted lockout procedure "Ironer line 1". Violation occurred on or about 1/24/2025.
Translate